Truck Mounted Water Cart Hire in Avisford

Latest news in Avisford, NSW

5th December 2018

Multi-billion-dollar high-speed rail proposed for Regional NSW!

The current New South Wales Government has announced plans for four state-of-the-art fast rail routes connecting Sydney to a collection of growing population centres across regional NSW, along with a direct route to Canberra in the Australian Capital Territory.

Read more here
20th April 2021

Victoria-New South Wales Interconnector Funding Approved

Funding for the Victoria-New South Wales Interconnector (VNI Minor) has been approved by the Australian Energy Regulator (AER), which will play a significant role in bolstering the electricity supply following the closure of Liddell Power Station in August 2023.The Australian Energy Market Operator’s (AEMO) 2020 Integrated System Plan (ISP) identified VNI Minor as a project required to address cost, security and reliability issues in the National Electricity Market.AER Chair, Clare Savage, said, “VNI Minor was proposed by AEMO in their role as the national planner responsible for identifying new transmission needs to support the energy system’s transition.“In our role, we’ve assessed TransGrid’s proposed costs and determined that they are reasonable. The AER has approved the $45 million that is needed to deliver the project.“The project will increase transmission capacity between New South Wales and Victoria and provide consumers with secure and reliable energy supplies.”VNI Minor is the first ‘actionable project’ to progress under new rules governing the ISP and the AER’s decision is the final stage in the regulatory process.The new rules require the AER to assess the prudence and efficiency of the costs of delivering the option found to offer the highest net market benefits in AEMO’s ISP.The AER’s decision amends TransGrid’s existing 2018-23 revenue determination to account for the costs of delivering the project.Average residential customers in New South Wales will pay an estimated extra $1 on their bills in 2022-23 as a result of this decision.TransGrid Project Director, Dany Gittani, said, “The VNI Minor project will allow more energy to flow between the two states and help lower the cost of wholesale electricity across the National Electricity Market.“The VNI Minor project involves TransGrid installing ‘smart wires’ power flow controller technology within our Stockdill substation in the ACT.‘Smart wires’ technology enables the real-time control of electricity flows along powerlines. The system detects areas of congestion in the network and automatically redirects flows to less congested lines, under certain network scenarios. It will allow more energy to be transferred between Victoria and NSW.“The AER decision enables us to deliver the project to fruition this year.”

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 4.98 by 157 Customer Reviews