Traxcavator Hire in Robina

Latest news in Robina, QLD

31st March 2021

$47 Million Announced for QLD Pumped Hydro Plant

Genex has been approved up to $47 million in funding by the Australian Renewable Energy Agency (ARENA) to build the Kidston Stage 2 Pumped Hydro Energy Storage project. This new pumped hydro facility will be co-located with the existing 50MW solar farm.

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
28th October 2020

2020 QLD Election: Biggest Infrastructure Promises, Controversies and Tips

With the 2020 Queensland State Election just days away, every potential party is scrambling to get their last-minute campaign messages out before the blackout period. Maybe your mailbox is crammed full of shiny flyers, maybe you’ve received a text, or maybe your Youtube ads have been bombarded with political faces and bolded words. No matter who you are, no one has escaped the noise of this election. From rumours of tampered ballot boxes to candidate signs being vandalised, election season has never been more chaotic.

Read more here
Rated 4.6 by 290 Customer Reviews