Steel Fixing in Calliope

Steel fixing is the installation and tying together of steel bars and mesh in order to strengthen concrete used in structures. The steel fixing process is frequently used in construction projects large and small. Steel fixing contractors are responsible for tasks like cutting and bending bars or mesh and installing pre-cast slabs and beams.

At iSeekplant, you can easily look for steel fixing in Calliope on our online platform. We have a nationwide network of steel fixing companies and contractors that you can easily find using our search feature or just submit your request to our Get a Quote tool and get contractors contacting you with rates within hours. View our listings of steel fixing companies in Calliope above.

Different Types of Reinforcing Bar (Rebar)

Reinforcing bars, or more commonly known as rebar, increases the tensile strength of concrete. Rebar has various lengths and diameters available in the market. In fact, there are six types of rebar and each having unique strengths and weaknesses.

Here are the six types of rebar:

  1. European Rebar. This rebar is mostly made out of manganese. Though it's very easy to work with European rebar because of its low resistance to bending, it's not recommended for use in areas that experience earthquakes.
  2. Carbon Steel Rebar. Known as the "black bar", this rebar, although prone to corrosion, is used in almost every type and scale of construction project.
  3. Epoxy-Coated Rebar. Another black rebar, but with an epoxy coat. Unlike black bars, this is more resistant to corrosion.
  4. Galvanized Rebar. Forty times more resistant to corrosion than epoxy-coated rebar, and 40% higher than the latter in cost.
  5. Glass-Fiber-Reinforced-Polymer (GFRP). Purely resistant to corrosion but costs are ten times more than epoxy-coated rebar.
  6. Stainless Steel Rebar. The most expensive rebar but also considered the best rebar for most construction projects.

Find Steel Fixing in Calliope easily with iSeekplant

Easily look for steel fixing in Calliope using iSeekplant. Use our large online database to compare and contact steel fixing companies in Calliope quickly and easily. Can't find a steel fixing contractor in Calliope? Try searching in Tannum Sands, Gladstone, Callide, Biloela or Mount Morgan. Our suppliers provide a host of useful and related services you might also be interested in like . Steel fixing projects are made easy when you use iSeekplant to find local contractors and compare the best rates in the area. Do a search or submit a quote request now to find out how easy it is!

Latest news in Calliope, QLD

27th April 2021

$1.96B QLD MacIntyre Wind Farm Precinct Approved

Two windfarms and up to 400 jobs in the Southern Downs are a step closer to reality with the State Assessment and Referral Agency giving the green light.Deputy Premier and Planning Minister Steven Miles said Acciona received approval to build the $1.96 billion MacIntyre Wind Farm Precinct (the Precinct) at Cement Mills, approximately 40 kilometres south-west of Warwick.“Soon there will be 180 wind turbines in the Darling Downs South West region propelling up to 1026 megawatts of energy into Queensland’s electricity network,” Mr Miles said.“Once operational the MacIntyre Wind Farm Precinct is expected to generate enough renewable electricity to supply about 700,000 Queensland homes.“The MacIntyre Wind Farm Precinct is set to provide up to 400 local jobs during construction, with an additional 240 jobs for the construction of the 64km transmission line, and 14 fulltime jobs once in operation.“Acciona also expects its local spend during construction to exceed $500 million, which is great news for the Southern Downs, Goondiwindi, and Toowoomba communities.”Minister for Energy, Renewables and Hydrogen Mick de Brenni said the project would deliver jobs for Queenslanders.“I’m pleased that Acciona have committed to our Government’s Buy Queensland approach to use a local workforce and suppliers on this $1.96 billion project,” he said.“This will deliver significant economic benefits for the Darling Downs and beyond, and more renewable megawatts as the state works to reach its 50 per cent renewable energy target by 2030.“The commitment to a 50 per cent renewable energy target by 2030 has already enabled more than $9.9 billion of investment since December 2016 and created 7,000 construction jobs.Mr de Brenni said the 103 megawatt Karara Wind Farm, which forms part of the MacIntyre Wind Farm Precinct, will be owned and operated by the Government-owned energy generator, CleanCo Queensland.“This will be a central energy generator for CleanCo and will significantly bolster its portfolio of low-emission energy assets – owned by Queensland, for Queensland.”In addition to owning and operating the Karara Wind Farm, CleanCo will also purchase 400 megawatts of renewable energy per year from the MacIntyre Wind Farm.CleanCo CEO Dr Maia Schweizer said the approval is a significant step forward for the project.“CleanCo is proud to be partnering with Acciona to deliver such a significant project in Queensland’s renewable energy landscape,” Dr Schweizer said.“With this project we are harnessing wind with a profile that perfectly complements solar energy - that allows us to provide reliable, affordable low-emissions energy to our large commercial and industrial customers using our unique portfolio, and is an important step toward unlocking Queensland’s potential to generate and use globally competitive clean energy.” Acciona’s Australian Managing Director for Energy, Brett Wickham said the 36,000-hectare MacIntyre windfarm represents the company’s largest ever wind farm.“We are excited to be moving forward with this project and are proud to support the Queensland Government’s decarbonisation strategy.“The Precinct will avoid the emission of nearly 3 million tonnes of carbon dioxide each year.”Part of the Precinct will be developed in partnership with Queensland’s own Ark Energy Corporation. Ark Energy, a subsidiary of Korea Zinc Co. and the Australian vehicle for its clean energy business, has taken a 30 per cent stake in the 923 megawatt MacIntyre Wind Farm exercisable at Final Investment Decision. The approved development of the Precinct includes the 162 turbine MacIntyre project, the smaller 18 turbine Karara project and 64km overhead transmission line to the Powerlink network near Millmerran.Acciona expects to start construction on the MacIntyre Wind Farm Precinct in the second half of this year and be fully operational by 2024.

Read more here
30th January 2019

A Step-by-Step Guide to Building a New Driveway

Steps to build a driveway: Check for underground utilities Survey your land and know your boundaries Mark your project area and stake out boundaries Excavate topsoil and level out project area Lay wooden forms around the project area, anchored with stakes Add in sand to firm up the soil, and gravel to ensure base thickness Compact gravel and soil Lay steel reinforcing mesh or bars Pour concrete Smooth out and level the concrete Set and cure concrete (don’t rush it!) Park your car! Items You Will Need to Build a Driveway Wheelbarrow Tape Measure Shovel Hand Spade Compactor Site String Line Stakes Spirit Level Straight Edge Tool Hand Float Cement Trowel Edger Hose Groover Broom

Read more here
23rd March 2021

CPB Contractors Win $289M Bruce Highway Upgrade

The Queensland Government has awarded CPB Contractors (a CIMIC Group company) a multi-million-dollar contract to deliver major upgrades to the Bruce Highway.

Read more here