Rock Retaining Walls in Hills Shire

Rock Retaining Wall Contractors in Hills Shire

If you're looking for an alternative to your concrete or timber retaining walls, then a rock retaining wall is a good option. It can add a rustic and natural aesthetic to your garden. It is also extremely durable, and its sheer weight keeps massive amounts of soil retained. However, to make sure that a rock retaining wall is installed correctly, you must hire professional contractors.

At iSeekplant, it is easy finding rock retaining wall contractors in Hills Shire for your backyard. We have a nationwide network of rock retaining wall companies featured on our online directory. You can also use our get a quote tool to submit a quote request and have suppliers contacting you within the hour. Find rock retaining walls in Hills Shire now by checking out our listings above.

Cost of a Rock Retaining Wall

As mentioned, the installation of a rock retaining wall needs the help of a professional. Therefore, when thinking about adding one to your backyard, the total expenses will include rock retaining wall materials and labour. Check out the average cost of rock retaining walls below on a per square meter and material basis:

  • Random Unselected Rock = $140 to $250 per square meter
  • Better Quality Cut Sandstone = $180 to $280 per square meter
  • A Grade Cut Sandstone = $280 to $500 per square meter

Here are the factors that affect rock retaining wall costs:

  • The height, size as well as the scale of the wall
  • The type of rocks that will be used
  • The design of the wall which includes excavation and drainage specifications
  • When you opt to hire a professional, which will add to the total cost as labour-hire fees

Hire a Rock Retaining Wall Contractor in Hills Shire at iSeekplant!

Here at iSeekplant, you can use our get a quote tool to find rock retaining wall services in Hills Shire. If you can't find any retaining wall contractors in your location, try viewing our available rock retaining wall companies in Riverstone, Sydney West, Thornleigh, Parramatta or Marsden Park. Also try viewing some related services you might be interested in, such as Retaining Walls, Block Retaining Walls and Gabion Retaining Walls.

Latest news in Hills Shire, NSW

7th December 2018

WestConnex reaches halfway mark

Construction of WestConnex, which the City of Sydney Council has recently estimated to cost over $45 billion, is fast approaching the halfway mark as we near the end of 2018.

Read more here
13th February 2019

How To Dig A Trench

Steps to dig a trench: Know the lay of the land (Call Dial Before You Dig) Create a plan Organise machines and any missing equipment Begin trenching Remove dips and humps Clean up site Install cabling, pipes or drainage

Read more here
20th April 2021

Victoria-New South Wales Interconnector Funding Approved

Funding for the Victoria-New South Wales Interconnector (VNI Minor) has been approved by the Australian Energy Regulator (AER), which will play a significant role in bolstering the electricity supply following the closure of Liddell Power Station in August 2023.The Australian Energy Market Operator’s (AEMO) 2020 Integrated System Plan (ISP) identified VNI Minor as a project required to address cost, security and reliability issues in the National Electricity Market.AER Chair, Clare Savage, said, “VNI Minor was proposed by AEMO in their role as the national planner responsible for identifying new transmission needs to support the energy system’s transition.“In our role, we’ve assessed TransGrid’s proposed costs and determined that they are reasonable. The AER has approved the $45 million that is needed to deliver the project.“The project will increase transmission capacity between New South Wales and Victoria and provide consumers with secure and reliable energy supplies.”VNI Minor is the first ‘actionable project’ to progress under new rules governing the ISP and the AER’s decision is the final stage in the regulatory process.The new rules require the AER to assess the prudence and efficiency of the costs of delivering the option found to offer the highest net market benefits in AEMO’s ISP.The AER’s decision amends TransGrid’s existing 2018-23 revenue determination to account for the costs of delivering the project.Average residential customers in New South Wales will pay an estimated extra $1 on their bills in 2022-23 as a result of this decision.TransGrid Project Director, Dany Gittani, said, “The VNI Minor project will allow more energy to flow between the two states and help lower the cost of wholesale electricity across the National Electricity Market.“The VNI Minor project involves TransGrid installing ‘smart wires’ power flow controller technology within our Stockdill substation in the ACT.‘Smart wires’ technology enables the real-time control of electricity flows along powerlines. The system detects areas of congestion in the network and automatically redirects flows to less congested lines, under certain network scenarios. It will allow more energy to be transferred between Victoria and NSW.“The AER decision enables us to deliver the project to fruition this year.”

Read more here
Rated 4.6 by 290 Customer Reviews