Retaining walls are both functional and aesthetic additions to your residential or commercial property. Its functional feature is its ability to prevent soil erosion and even manage your rainwater flow. For aesthetic purposes, retaining walls allow you to create a beautiful landscaping feature.

Install a retaining wall by hiring a retaining wall contractor in Hills Shire through iSeekplant. We have a nationwide network of retaining wall contractors across Australia that you can find using our get a quote tool. Find someone to build your retaining wall today by checking out our listing of retaining wall companies in Hills Shire above.

Retaining Wall Costs

Below are the average retaining wall costs on a per square meter and material basis:

  • Treated Pine = $250 to $350 per square meter
  • Treated Timber Sleepers/Hardwood = $300 to $450 per square meter
  • Sandstone Blocks = $300 to $550 per square meter
  • Reinforced Concrete Blocks = $400 to $680 per square meter
  • Concrete Besser Blocks = $550 to $700 per square meter

Here are the factors that affect retaining wall costs:

  • The height of the wall
  • The size as well as the scale
  • The type of materials that will be used
  • The design of the wall, including excavation and drainage specifications
  • Labour fees when you opt to hire professionals and contractors

Remember that when choosing a retaining wall, you also have to consider the material lifespan and structural integrity. Also, consider the place where you will be installing the wall. For instance, if it will be installed in a consistently damp place, it's best not to use wood materials.

Find the right type of retaining walls in Hills Shire for your landscaping project at iSeekplant!

iSeekplant has the largest online directory of retaining wall companies across the country. Try searching for a retaining wall contractor in Hills Shire or if you can't find a suitable supplier in your location, try viewing companies in Riverstone, Sydney West, Thornleigh, Parramatta or Marsden Park. We also provide several related services you might be interested in, such as Block Retaining Walls, Rock Retaining Walls and Gabion Retaining Walls.

Latest news in Hills Shire, NSW

6th September 2018

$9.3b, 1700 km Inland Rail Project Given Green Light to Start Construction

Australia’s biggest interstate rail project has been green-lighted to begin construction on the 1,700km Melbourne to Brisbane Inland Rail project.

Read more here
20th April 2021

Victoria-New South Wales Interconnector Funding Approved

Funding for the Victoria-New South Wales Interconnector (VNI Minor) has been approved by the Australian Energy Regulator (AER), which will play a significant role in bolstering the electricity supply following the closure of Liddell Power Station in August 2023.The Australian Energy Market Operator’s (AEMO) 2020 Integrated System Plan (ISP) identified VNI Minor as a project required to address cost, security and reliability issues in the National Electricity Market.AER Chair, Clare Savage, said, “VNI Minor was proposed by AEMO in their role as the national planner responsible for identifying new transmission needs to support the energy system’s transition.“In our role, we’ve assessed TransGrid’s proposed costs and determined that they are reasonable. The AER has approved the $45 million that is needed to deliver the project.“The project will increase transmission capacity between New South Wales and Victoria and provide consumers with secure and reliable energy supplies.”VNI Minor is the first ‘actionable project’ to progress under new rules governing the ISP and the AER’s decision is the final stage in the regulatory process.The new rules require the AER to assess the prudence and efficiency of the costs of delivering the option found to offer the highest net market benefits in AEMO’s ISP.The AER’s decision amends TransGrid’s existing 2018-23 revenue determination to account for the costs of delivering the project.Average residential customers in New South Wales will pay an estimated extra $1 on their bills in 2022-23 as a result of this decision.TransGrid Project Director, Dany Gittani, said, “The VNI Minor project will allow more energy to flow between the two states and help lower the cost of wholesale electricity across the National Electricity Market.“The VNI Minor project involves TransGrid installing ‘smart wires’ power flow controller technology within our Stockdill substation in the ACT.‘Smart wires’ technology enables the real-time control of electricity flows along powerlines. The system detects areas of congestion in the network and automatically redirects flows to less congested lines, under certain network scenarios. It will allow more energy to be transferred between Victoria and NSW.“The AER decision enables us to deliver the project to fruition this year.”

Read more here
15th October 2018

Thiess nabs major $1.2 billion, 300 job contract at Mt Arthur, Hunter Valley

Thiess has won a 5-year, $1.2b contract for mining services at Mt Arthur, in the Hunter Valley, that is anticipated to create around 300 jobs.

Read more here
Rated 4.6 by 290 Customer Reviews