Long Arm Excavator Hire in Katherine, NT 850

Latest news in Katherine, NT

31st October 2018

Excavator and Digger Hire Rates Guide

*Last updated 09.06.2020 Quick Links: What are average excavator and digger hire rates? What are minimum excavator hire hours with an operator (wet hire)? What are minimum excavator hire hours without an operator (dry hire)? What are travel costs in excavator hire rates? What are average excavator and digger mobilisation & float costs? What are excavator hire penalty rates? What are average discount rates for long-term excavator hire? How to get the best excavator hire rates What are average excavator and digger hire rates?                   iSeekplant has received a significant amount of feedback recently that the rates for hiring mini excavators have dropped substantially - as enterprising operators purchase machines and offer them for dry hire in a saturated market.

Read more here
6th August 2019

Excavator Hire Guide (& How To Get The Best Prices)

Need to hire an excavator but are unsure how to? It isn’t a difficult process but hiring an excavator does have a few steps involved, and will require information from you about the job. Hiring an excavator can seem daunting, especially if it’s not something you do regularly. This step by step excavator hire process is designed to help everyone hire an excavator, whether you use them everyday onsite or have never needed an excavator before.When you need to hire an excavator, you normally need to have something demolished, removed, dug up or filled in. If this applies to you then you need to identify some key information that will make your call with an excavator hire company a breeze.

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 4.8 by 116 Customer Reviews