Tracked Backhoe Hire in Melbourne, VIC 3000

Latest news in Melbourne, VIC

25th May 2020

$1.2b of Shovel Ready Projects to be Fast-Tracked in Victoria

In a massive boost to the industry in Victoria, premier Daniel Andrews has yet again pushed to fast-track construction projects throughout Melbourne, approving upwards of $1.2 billion in building and development projects. The investment is part of the $2.7 billion stimulus package for the industry. 

Read more here
2nd June 2019

What is the right Backhoe for your job?

What is the right backhoe for your job? There are a few factors you need to consider before choosing which backhoe loader you need for your job. Backhoe loaders are great multi-function machines that are both cost and time efficient. The only major differences in backhoe models, aside from size, is their driving capacity, whether they are 4x4 driven, 2x4 driven or tracked.Backhoe loaders are perfect for light to medium workloads on jobs such as small demolition, digging holes, paving roads, breaking asphalt, laying pipes, setting up drainage systems and transporting heavy items. Backhoes are most effective when there is a range of work needing to be completed that could be done by multiple machines, but their individual hire rates are not cost effective.Backhoes are broken up into three parts, the boom, bucket and house, which make it easy for them to complete a range of jobs. Backhoes are designed to move over rough terrain with ease and not only dig up materials but also pick up and transport materials. There are many benefits to hiring a backhoe for your project, the main being the cost efficiency.

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 4.8 by 116 Customer Reviews