Straight Boom EWP Hire in Kerang

Latest news in Kerang, VIC

9th December 2020

Vic Govt Announces $1.5B in Rail Contracts

The Victorian Government is preparing to award $1.5 billion in rail work contracts to remove 75 dangerous and congested level crossings across Victoria.

Read more here
5th January 2021

John Holland Wins $285 Million Melbourne Rail Contract

The $285.6 million Glenroy level crossing removal project has been awarded to John Holland in alliance with Kellogg Brown and Root (KBR) and Metro Trains Melbourne.

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 5.00 by 9 Customer Reviews