Open Bowl Twin Power Scraper Hire in Castlemaine

Latest news in Castlemaine, VIC

13th December 2019

Scraper Hire Rates Guide

*Last Updated: June 2020 Quick Links: What do you use a scraper for? How does a scraper work? What are typical scraper hire rates in Australia? Elevating scraper hire rates Open bowl scraper hire rates Twin power scraper hire rates "Classic Machines" Minimum scraper hire terms with an operator Scraper rental penalty rates How to get the best scraper hire prices! What do you use a scraper for? Scrapers remove unnecessary dirt, gravel and other materials from surfaces. The scraper's advantage over other earthmoving machines is it's capability for moving wet soil, heavy soil and other tough soil conditions. It can not only scrape, but also dig, haul, load and dump. A scraper uses less fuel than any other earthmoving machine - 30% less with improved transmission. Construction and mining jobs can use scrapers, though they have a disadvantage moving on rough terrain. You can apply a range of scraper attachments to offset this disadvantage. 

Read more here
11th February 2019

A Simple DIY Guide to Land Clearing

Steps to clearing your backyard: Know the lay of the land Create a plan Organise machines and any missing equipment Knock down trees Remove tree stumps Conduct a clean out of the area Excavate topsoil Fill in the site, level, and compact soil Dispose of garden waste and excess soil

Read more here
16th December 2019

$910m Melbourne Rail Contracts Awarded by State Government

The Victorian government has awarded new contracts worth $910 million to remove level crossings throughout Melbourne. A Lendlease, WSP, Acciona Coleman Rail and Metro Trains Melbourne alliance has won a $744 million contract to remove five crossings on the Frankston line. A $166m contract will see a level crossing on the Pakenham line removed by Fulton Hogans and Metro Trains Melbourne.The contracts are part of a programme to remove 75 congested and dangerous level crossings by 2025. Minister for Transport Infrastructure Jacinta Allan said the state is “well on track”, with 30 of the unsafe crossings already removed and contracts for a further 50 now awarded. “We said we’d remove 75 level crossings by 2025 and with contracts now awarded for 50".The government is investing $3bn to improve the Frankston line, with major works starting in Cheltenham and Mentone. The new Carrum Station is set to open in mid-February.

Read more here
Rated 4.8 by 116 Customer Reviews