Laser Scoop Scraper Hire in Werribee

Latest news in Werribee, VIC

2nd September 2019

Can any other machines do the same job as a scraper?

What machines are used for earth-moving? In summary, yes, there are other machines used in the construction, mining and agriculture industries that do the same job as a scraper machine, however some are nowhere near as efficient.

Read more here
7th December 2020

What is a Scraper?

Quick Links: How do scrapers work? What are the different types of scrapers? What are the typical scraper hire rates? Scrapers are powerful machines that are typically used for agricultural, mining and construction projects. Scrapers are capable of completing digging, loading, hauling, dumping and earthmoving projects. While they may look similar to graders, scrapers differ by having a hopper and gate with a blade at the bottom. As the blade scrapes up dirt or other materials when the machine moves forward, the material is forced into the hopper. Once the hopper is completely full, the material is taken away to be disposed of.These machines work most efficiently when the fill and cut areas are close together and long enough for the hopper to be filled in one run. It’s also possible for a team to use multiple scrapers in a long cut area, along with dozers and the push-pull technique.

Read more here
20th April 2021

Victoria-New South Wales Interconnector Funding Approved

Funding for the Victoria-New South Wales Interconnector (VNI Minor) has been approved by the Australian Energy Regulator (AER), which will play a significant role in bolstering the electricity supply following the closure of Liddell Power Station in August 2023.The Australian Energy Market Operator’s (AEMO) 2020 Integrated System Plan (ISP) identified VNI Minor as a project required to address cost, security and reliability issues in the National Electricity Market.AER Chair, Clare Savage, said, “VNI Minor was proposed by AEMO in their role as the national planner responsible for identifying new transmission needs to support the energy system’s transition.“In our role, we’ve assessed TransGrid’s proposed costs and determined that they are reasonable. The AER has approved the $45 million that is needed to deliver the project.“The project will increase transmission capacity between New South Wales and Victoria and provide consumers with secure and reliable energy supplies.”VNI Minor is the first ‘actionable project’ to progress under new rules governing the ISP and the AER’s decision is the final stage in the regulatory process.The new rules require the AER to assess the prudence and efficiency of the costs of delivering the option found to offer the highest net market benefits in AEMO’s ISP.The AER’s decision amends TransGrid’s existing 2018-23 revenue determination to account for the costs of delivering the project.Average residential customers in New South Wales will pay an estimated extra $1 on their bills in 2022-23 as a result of this decision.TransGrid Project Director, Dany Gittani, said, “The VNI Minor project will allow more energy to flow between the two states and help lower the cost of wholesale electricity across the National Electricity Market.“The VNI Minor project involves TransGrid installing ‘smart wires’ power flow controller technology within our Stockdill substation in the ACT.‘Smart wires’ technology enables the real-time control of electricity flows along powerlines. The system detects areas of congestion in the network and automatically redirects flows to less congested lines, under certain network scenarios. It will allow more energy to be transferred between Victoria and NSW.“The AER decision enables us to deliver the project to fruition this year.”

Read more here
Rated 4.6 by 290 Customer Reviews