Grader Hire in Woomera, SA 5720

In a rush? Let us get 3 quotes for you

We will get you:

  • Fast & Free Quotes

  • The Best Price

  • Great Operators

Latest news in Woomera, SA

6th February 2019

A step-by-step guide to building a shed

Steps to build a shed: Know the lay of the land Draft your up your plans Finalise plans and mark out area Excavate the slab hole Install wooden forms around excavated slab hole Pour basecourse and compact it Add in layer of sand Lay a sheet of polythene Lay reinforcing mesh Pour and cure concrete (one of the hardest and most tedious steps) Organise shed frame Install and secure shed frame (fasten/fix to slab) Install shelving, furniture, and decor

Read more here
4th August 2019

Do you need a licence to operate a grader?

When it comes to operating licences for earthmoving machinery like graders there have been changes in recent times that make a yes/no answer complicated. Officially, if you are in Australia you no longer need a licence, such as an earthmoving or particular crane certification (EPC), to operate most earthmoving machines. However, it doesn’t mean you can just rock up to a worksite and hop on a grader with no experience. It does mean that you have to take the necessary steps to become a competent grader operator. As graders are a vital finishing machine on any worksite the project manager or the Person Conducting a Business or Undertaking (PCBU) are very particular with a grader operator’s experience and skills. The need for an EPC licence was revoked in 2011 by the Australian Federal Government to make it easier for workers to responsibly use a range of plant equipment. Although this then meant that a range of other management and operator responsibilities took its place to ensure the safety and productivity of the worksite.

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 4.8 by 116 Customer Reviews