Franna Hire in Beaconsfield, VIC 3807

Latest news in Beaconsfield, VIC

31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
20th June 2019

What is the right Franna Crane for my job?

Choosing which franna crane to hire for your job can be a complicated task with the seemingly endless range of options on the market. Franna crane’s are extremely versatile and flexible, making them ideal for a variety of applications. Their compact size enables you to maneuver and operate in narrow spaces, as well as travel on roads quickly and easily. The franna ensures a powerful and efficient operation, and since its inception in the 1980’s, it has been widely utilised in the construction industry.

Read more here
16th December 2019

$910m Melbourne Rail Contracts Awarded by State Government

The Victorian government has awarded new contracts worth $910 million to remove level crossings throughout Melbourne. A Lendlease, WSP, Acciona Coleman Rail and Metro Trains Melbourne alliance has won a $744 million contract to remove five crossings on the Frankston line. A $166m contract will see a level crossing on the Pakenham line removed by Fulton Hogans and Metro Trains Melbourne.The contracts are part of a programme to remove 75 congested and dangerous level crossings by 2025. Minister for Transport Infrastructure Jacinta Allan said the state is “well on track”, with 30 of the unsafe crossings already removed and contracts for a further 50 now awarded. “We said we’d remove 75 level crossings by 2025 and with contracts now awarded for 50".The government is investing $3bn to improve the Frankston line, with major works starting in Cheltenham and Mentone. The new Carrum Station is set to open in mid-February.

Read more here
Rated 4.8 by 116 Customer Reviews