Crushing and Screening Equipment Hire in Emerald

Latest news in Emerald, QLD

31st March 2021

$47 Million Announced for QLD Pumped Hydro Plant

Genex has been approved up to $47 million in funding by the Australian Renewable Energy Agency (ARENA) to build the Kidston Stage 2 Pumped Hydro Energy Storage project. This new pumped hydro facility will be co-located with the existing 50MW solar farm.

Read more here
30th January 2019

A Step-by-Step Guide to Building a New Driveway

Steps to build a driveway: Check for underground utilities Survey your land and know your boundaries Mark your project area and stake out boundaries Excavate topsoil and level out project area Lay wooden forms around the project area, anchored with stakes Add in sand to firm up the soil, and gravel to ensure base thickness Compact gravel and soil Lay steel reinforcing mesh or bars Pour concrete Smooth out and level the concrete Set and cure concrete (don’t rush it!) Park your car! Items You Will Need to Build a Driveway Wheelbarrow Tape Measure Shovel Hand Spade Compactor Site String Line Stakes Spirit Level Straight Edge Tool Hand Float Cement Trowel Edger Hose Groover Broom

Read more here
28th October 2020

2020 QLD Election: Biggest Infrastructure Promises, Controversies and Tips

With the 2020 Queensland State Election just days away, every potential party is scrambling to get their last-minute campaign messages out before the blackout period. Maybe your mailbox is crammed full of shiny flyers, maybe you’ve received a text, or maybe your Youtube ads have been bombarded with political faces and bolded words. No matter who you are, no one has escaped the noise of this election. From rumours of tampered ballot boxes to candidate signs being vandalised, election season has never been more chaotic.

Read more here
Rated 4.6 by 290 Customer Reviews