Concrete Pumping Hire Hire in Mount Barker, WA 6324

Latest news in Mount Barker, WA

19th August 2019

Concrete Pump Hire Rates Guide

*Last Updated June 2020 Quick Links: Concrete line pump hire rates Concrete boom pump hire rates Pumped concrete rates per cubic meter Concrete pump surcharge rates How to get the best concrete pump hire rates What are typical Concrete Line Pump Hire Rates? Line Pump (Trailer) dry hire rate: $165 - $182 + GST Per Hour Line Pump (Trailer) wet hire rate: $190 - $228 + GST Per Hour Line Pump (Truck) dry hire rate: $172 - $188 + GST Per Hour Line Pump (Truck) wet hire rate: $205 - $235 + GST Per Hour Line Pump (Hose Extension) surcharge: $7 - $12 + GST Per Meter Line Pump hire rates tend not to vary as significantly as other machines on the market today, however, there is a range of factors that may influence how much you end up paying. When looking at hiring a line pump, it is essential to understand the requirements of your project and hire a machine that best suits your needs. When it comes to line pumps, hire rates may vary depending on whether you’re hiring a truck-mounted or trailer-mounted line pump, though the difference is not significant. The main costs here are incurred from hose extension surcharges which will often be upwards of $7 per meter over the contract's original agreement.As line pumps are more cost-effective than other concrete transfer methods, they are the preferred choice for small construction and residential concrete work. It should be noted that when looking to wet hire line pumps that most rates will be inclusive of one or two operators but may offer extra personnel for a labour surcharge. Need to hire a concrete pump? Get free competitive quotes through iSeekplant!

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
14th October 2018

Tenders called for desalination plant within WA’s $396m Myalup-Wellington project

Tenders have officially been opened for the construction of a desalination plant for a major Western Australian project, the now $396m Myalup-Wellington water project.

Read more here
Rated 4.8 by 116 Customer Reviews