Chain Block Hire in Morwell

Latest news in Morwell, VIC

5th January 2021

John Holland Wins $285 Million Melbourne Rail Contract

The $285.6 million Glenroy level crossing removal project has been awarded to John Holland in alliance with Kellogg Brown and Root (KBR) and Metro Trains Melbourne.

Read more here
25th May 2020

$1.2b of Shovel Ready Projects to be Fast-Tracked in Victoria

In a massive boost to the industry in Victoria, premier Daniel Andrews has yet again pushed to fast-track construction projects throughout Melbourne, approving upwards of $1.2 billion in building and development projects. The investment is part of the $2.7 billion stimulus package for the industry. 

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 4.8 by 116 Customer Reviews