$280 million Granville Harbour Wind Farm set to begin construction after receiving green light

Tasmania's Granville Harbour Wind Farm is set to begin construction shortly after receiving its required funding. This 112 megawatt is expected to generate enough electricity to power more than 46,000 homes.     The project, which has received funding from the Clean Energy Finance Corporation (CEFC), will deliver a one-third increase to Tasmania's wind power capacity.

Read more here
25th February 2020

How to Cut Down a Large Tree

Site safety above everything else Remove the branches from the tree Cut down the trunk Use a wood chipper Use a log splitter Hiring someone to come and cut down a tree in your backyard can be an expensive exercise. So why not do it yourself? Although it may seem like a massive task at first, if you take the necessary safety precautions and carefully read this guide, you’ll be able to cut down any tree on your property with ease.

Read more here
31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
Rated 4.8 by 116 Customer Reviews