Find Machines

Find work

Contact

Underground Equipment Hire in Parap, NT 804

Refine your search

Latest news in Parap, NT

11th February 2019

A simple DIY guide to land clearing

Steps to clearing your backyard: Know the lay of the land Create a plan Organise machines and any missing equipment Knock down trees Remove tree stumps Conduct a clean out of the area Excavate topsoil Fill in the site, level, and compact soil Dispose of garden waste and excess soil

Read more here
30th January 2019

A step-by-step guide to building a new driveway

Steps to build a driveway: Decide on your intent and goal Call Dial Before You Dig Survey your land and know your boundaries Mark your project area and stake out boundaries Excavate topsoil and level out project area Lay wooden forms around the project area, anchored with stakes Add in sand to firm up the soil, and gravel to ensure base thickness Compact gravel and soil Lay steel reinforcing mesh or bars Pour concrete Smooth out and level the concrete Set and cure concrete (don’t rush it!) Park your car!

Read more here
28th September 2017

Civmec Awarded Several Northern Gas Pipeline Contracts

Jemena has awarded several contracts for works on the Northern Gas Pipeline. Construction and engineering company Civmec announced on Wednesday that the contract is for camp set-up, site civil, structural steel fabrication and the structural, mechanical, piping, electrical and instrumentation (SMPEI) installation works at the Phillip Creek Compressor Station.

Read more here
Get Quotes
Rated 4.8 by 116 Customer Reviews