Hydraulic Jack Hire in Marsden Park

Related Hydraulic Jack Hire Search

Nearby Hydraulic Jacks Hire Locations

Latest news in Marsden Park, NSW

20th October 2020

Shortlisted contractors announced for Warringah Freeway upgrade

After completing the Expressions of Interest process, the New South Wales Government has announced three shortlisted candidates for the Warringah upgrade project.

Read more here
30th January 2019

A Step-by-Step Guide to Building a New Driveway

Steps to build a driveway: Check for underground utilities Survey your land and know your boundaries Mark your project area and stake out boundaries Excavate topsoil and level out project area Lay wooden forms around the project area, anchored with stakes Add in sand to firm up the soil, and gravel to ensure base thickness Compact gravel and soil Lay steel reinforcing mesh or bars Pour concrete Smooth out and level the concrete Set and cure concrete (don’t rush it!) Park your car! Items You Will Need to Build a Driveway Wheelbarrow Tape Measure Shovel Hand Spade Compactor Site String Line Stakes Spirit Level Straight Edge Tool Hand Float Cement Trowel Edger Hose Groover Broom

Read more here
20th April 2021

Victoria-New South Wales Interconnector Funding Approved

Funding for the Victoria-New South Wales Interconnector (VNI Minor) has been approved by the Australian Energy Regulator (AER), which will play a significant role in bolstering the electricity supply following the closure of Liddell Power Station in August 2023.The Australian Energy Market Operator’s (AEMO) 2020 Integrated System Plan (ISP) identified VNI Minor as a project required to address cost, security and reliability issues in the National Electricity Market.AER Chair, Clare Savage, said, “VNI Minor was proposed by AEMO in their role as the national planner responsible for identifying new transmission needs to support the energy system’s transition.“In our role, we’ve assessed TransGrid’s proposed costs and determined that they are reasonable. The AER has approved the $45 million that is needed to deliver the project.“The project will increase transmission capacity between New South Wales and Victoria and provide consumers with secure and reliable energy supplies.”VNI Minor is the first ‘actionable project’ to progress under new rules governing the ISP and the AER’s decision is the final stage in the regulatory process.The new rules require the AER to assess the prudence and efficiency of the costs of delivering the option found to offer the highest net market benefits in AEMO’s ISP.The AER’s decision amends TransGrid’s existing 2018-23 revenue determination to account for the costs of delivering the project.Average residential customers in New South Wales will pay an estimated extra $1 on their bills in 2022-23 as a result of this decision.TransGrid Project Director, Dany Gittani, said, “The VNI Minor project will allow more energy to flow between the two states and help lower the cost of wholesale electricity across the National Electricity Market.“The VNI Minor project involves TransGrid installing ‘smart wires’ power flow controller technology within our Stockdill substation in the ACT.‘Smart wires’ technology enables the real-time control of electricity flows along powerlines. The system detects areas of congestion in the network and automatically redirects flows to less congested lines, under certain network scenarios. It will allow more energy to be transferred between Victoria and NSW.“The AER decision enables us to deliver the project to fruition this year.”

Read more here
Rated 5.00 by 2 Customer Reviews