Find Machines

Find work

Contact

Grader Hire in Yanchep, WA 6035

Latest news in Yanchep, WA

31st January 2019

A step-by-step guide to building a retaining wall

 Steps to build a retaining wall: Know the lay of the land - contact Dial Before You Dig Draft your wall design Finalise plans and mark out area Excavate area and trench Lay and compact road base Lay steel bar grid/mesh and set up wooden forms Pour footing - lay cement and sand mix Screed and level the cement/sand mix Lay first row of bricks Fill first layer of bricks with blue metal aggregate Optional - Install drainage pipe Lay remaining layers of bricks Remove lugs from top layer Install caps Allow everything to dry

Read more here
14th November 2018

Grader Hire Rates Guide

Many earthmoving and construction jobs will need a grader on site. Graders are used for civil engineering projects to precisely refine surface levels that a scraper, excavator or dozer has “rough graded”. We delve into the nuts and bolts of all the questions you should ask yourself when hiring a grader. How big is a graders blade? Graders are fitted with a long movable blade used to create flat surfaces. Our grader hire suppliers categorise their graders by blade width, from less than 10ft, to 12ft, 14ft, 16ft, and right up to 24ft. Smaller blades might be used on jobs like embankments, drains and ditches. The larger 24ft bladed models are usually used in the construction of mine haul roads to make way for big rigid rear dump trucks to travel around mine sites.

Read more here
2nd November 2018

Rio Tinto delivers huge for Western Australia, $27 billion and 47,400 jobs!

An independent analysis has shown that Rio Tinto injected $27.3 billion into the West Australian economy, along with 13,000 direct jobs and 47,400 indirect full-time jobs across the State.

Read more here
Get Quotes
Rated 4.8 by 116 Customer Reviews