Find Machines

Find work

Contact

Concrete Pumping Hire Hire in Rockingham, WA 6168

Latest news in Rockingham, WA

30th November 2018

Rio Tinto to invest $3.5 billion into WA’s Koodaideri iron ore mine!

Rio Tinto has approved $3.5 billion AUD for their intelligent Koodaideri mine project in Western Australia, with the investment focused heavily on augmenting production, technology and innovation in the Pilbara.

Read more here
19th August 2019

Concrete Pump Hire Rates: What does it cost to hire a concrete pump?

What are typical Concrete Line Pump Hire Rates? Line Pump (Trailer) dry hire rate: $165 - $182 + GST Per Hour Line Pump (Trailer) wet hire rate: $190 - $228 + GST Per Hour Line Pump (Truck) dry hire rate: $172 - $188 + GST Per Hour Line Pump (Truck) wet hire rate: $205 - $235 + GST Per Hour Line Pump (Hose Extension) surcharge: $7 - $12 + GST Per Meter Line Pump hire rates tend not to vary as significantly as other machines on the market today, however, there is a range of factors that may influence how much you end up paying. When looking at hiring a line pump, it is essential to understand the requirements of your project and hire a machine that best suits your needs. When it comes to line pumps, hire rates may vary depending on whether you’re hiring a truck-mounted or trailer-mounted line pump, though the difference is not significant. The main costs here are incurred from hose extension surcharges which will often be upwards of $7 per meter over the contract's original agreement.As line pumps are more cost-effective than other concrete transfer methods, they are the preferred choice for small construction and residential concrete work. It should be noted that when looking to wet hire line pumps that most rates will be inclusive of one or two operators but may offer extra personnel for a labour surcharge.

Read more here
30th January 2019

A step-by-step guide to building a new driveway

Steps to build a driveway: Check for underground utilities Survey your land and know your boundaries Mark your project area and stake out boundaries Excavate topsoil and level out project area Lay wooden forms around the project area, anchored with stakes Add in sand to firm up the soil, and gravel to ensure base thickness Compact gravel and soil Lay steel reinforcing mesh or bars Pour concrete Smooth out and level the concrete Set and cure concrete (don’t rush it!) Park your car!

Read more here
Get Quotes
Rated 4.8 by 116 Customer Reviews